Sign In | Join Free | My uabig.com
China TOBO STEEL GROUP CHINA logo
TOBO STEEL GROUP CHINA
TOBO ALLOY GROUP TOBO Alloy Group is a mature, steady and energetic high-tech company, specializing in manufacture of high-temperature alloys and corrosion resistant alloys, such as Hastelloy, Haynes,
Verified Supplier

7 Years

Home > Seamless Steel Pipe >

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

TOBO STEEL GROUP CHINA
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

  • 1
  • 2

Brand Name : TOBO

Model Number : A269 TP347

Certification : API, ISO, SGS, BV, CE, PED, KOC, CCRC, PDO, CH2M HILL And Etc.

Place of Origin : China

MOQ : 1pcs

Price : Depending on quantity

Payment Terms : L/C, T/T, Western Union

Supply Ability : 10 ton/month

Delivery Time : 15-30 days depending on quantity

Packaging Details : Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc

Standard : ANIS B36.19

Alloy or not : Non-alloy

Technique : Hot Rolled,ERW,Cold Drawn,welded steel pipe,EWR

Thickness : Customized

Application : Structure Pipe,Oil Pipe,Gas Pipe,Bridge,Drill Pipe

Name : Stainless Steel Pipe

Contact Now

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

Detailed Information

Production Range:

Round Steel Pipe (17mm-406.4mm)
Square Steel Pipe (20mm*20mm-500mm*500mm)
Rectangular Steel Pipe (20mm*30mm-400mm*600mm)
Specification
OD
17mm-406.4mm
WT
0.8-20mm
Length
1-12m
Standards
GB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect.
Pipe ends
plain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp
Treatment
or as customers' requirement
Delivery Time
10days from stock; 15-25days produced according to the qty
Price Term
CIF, CFR, EXW
Loading Port
Shanghai, China/ Tianjin, China
Others
1.All the pipes is high-frequency welded.
2.Both inner and outer welded stab can be removed.
3.Special design available according to requirement.
4.Pipe can be necked down and punched holes.
5.Supplying BV or Inspection if client need.

Product Show

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

Product Test:
Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

Our Company Introduction:

We are one of the Professional manufacturers Exporter Pipeline products in China .

Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000 square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings, flanges and related accessories. Now, it owns a number of advanced pipe production equipments, metal, forging, machining, cold forming, hot extrusion, such as heat treatment process, producing 60, 000 tons of pipe fittings. Company with a variety of detection devices, such as nondestructive testing, chemical analysis, metallographic examination, physical experiments. The technical is very strength, our main products contain fittingsforged socket welding fittings and threaded fittings, pipe weld and the materials of the products contain stainless steel ,duplex-stainless steel alloy steel.
Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19
Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19
Certifications
Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L , West Union,VISA is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
If you have any question,please feel free to contact me. Sales Service 24 hours
we are sure your inquiry or requirements will get prompt attention.

Product Tags:

AISI A312 Stainless Steel Seamless Pipe

      

Water Seamless Steel Pipe

      

Industry Round Steel Seamless Pipe

      
Wholesale Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19 from china suppliers

Stainless Steel Pipe A269 TP347 High Pressure Temperature Steel ANSI B36.19 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TOBO STEEL GROUP CHINA
*Subject:
*Message:
Characters Remaining: (0/3000)